Scheduler
                                        The scheduler is used to plan when and how often the Cube will be refreshed/reloaded:
- Load All will remove the data and re-load everything into the cube.
 - Refresh does add only new records based on the Tracking defined at the Data Source level.
 
To access the scheduler:
- In the Cubes List, select a Cube.
 - 
                                                
In the Navigation Bar, click on the
Navigation drop-down list and select
Scheduler.
 
| Column | Description | 
|---|---|
| Description | Description of the job. | 
| Action | Load All or Refresh. | 
| Type | Frequency of the job. | 
| Last Start Run Date | Last time the job ran | 
| Last End Run Date | Last time the job finished. | 
| Next Run Date | Next time the job will run. | 
| Status | Last execution result status. |